Pumps · Valves · Instruments · Klang, since 1992

Built for plants
that never stop.

Centrifugal pumps, isolation valves and pressure instruments for palm oil mills, water treatment and petrochemical plants.

PN 40Pressure rating, max
DN 15–600Valve bore range
2,400 m³/hPump flow, max

Product families

Four families. One standard of build.

420 models in stock
01

Centrifugal pumps

End-suction & split-case

Up to 2,400 m³/h
02

Isolation valves

Gate, globe & butterfly

DN 15–600 · PN 40
03

Instruments

Gauges, switches & transmitters

0–600 bar
04

Pipework & fittings

Flanges, spools & strainers

ASME B16.5

Product range

Twelve product lines, stocked in Klang.

Datasheets for every line

Pump selector

Enter your duty point. We’ll match the pump.

ModelTypeEfficiency at dutyMotorMaterial

Illustrative results. Final selection confirmed by our application engineers.

Energy savings calculator

What is your old pump costing you?

Based on 330 running days a year
5 kW250 kW
2 h24 h
RM 0.30RM 0.70 / kWh

Compares a typical 15-year-old pump set (62% pump, 91% motor efficiency) with an Arus high-efficiency pump and IE4 motor (80% and 95%), installed at about RM 1,400 per kW. Your audit result may differ.

Estimated saving per year RM 0
Energy saved
CO₂ avoided
Saving per month
Typical payback
Book a free pump energy audit

Wetted-part materials

EN-GJL-250Cast ironClean water, HVAC
EN-GJS-400Ductile ironRaw water, cooling
SS316Stainless steelFood, chemicals
2205Duplex stainlessEffluent, seawater
CuSn10BronzeMarine, impellers

Industries

Where Arus equipment runs.

1,900 installations since 1992

Case studies

Measured after the change.

Figures from each plant’s own meters
Palm oil mill · Sungai Siput, Perak

Sri Kenari Oil Mill

31%Energy saved on POME pumps
99.4%Uptime over the peak crop

Six worn effluent pumps replaced with duplex AR-ES units trimmed to the real duty point. The mill ran the whole peak season without a pump stop.

Water treatment · Seremban, Negeri Sembilan

Rantau Hulu Treatment Works

24%Energy saved, high-lift station
18Months, no unplanned stop

Two 30-year-old split-case pumps rebuilt in our workshop with new impellers, wear rings and IE4 motors, back to 87% efficiency.

Textile dye house · Prai, Penang

Benang Mas Textiles

38%Energy saved on process water
11Months to pay back

Throttled valves replaced by variable-speed control: pressure transmitters on the header, VSD panels on four vertical multistage pumps.

Service & maintenance

Plans that keep the plant running.

Field engineers in Klang, Ipoh, Johor Bahru and Kuantan
Workshop fitter grinding a steel pump baseplate
Klang workshop · rebuilds, re-machining, baseplates
Wiring inside a pump motor control panel
VSD and control panels wired in-house

Essential

RM 3,600 / site / year
  • Annual inspection, up to 10 pumps
  • Vibration and bearing temperature readings
  • Phone support, office hours
  • Parts at list price
Choose Essential
Most chosen

Shutdown Ready

RM 9,800 / site / year
  • Quarterly inspections with vibration trending
  • Planned overhaul during your shutdown
  • 48-hour on-site response
  • Critical spares held in Klang for you
Choose Shutdown Ready

Total Care

RM 24,000 / site / year
  • Monthly visits and remote pump monitoring
  • All seals and wear parts included
  • 12-hour response, 7 days a week
  • Loan pump while yours is in the workshop
Choose Total Care
ISOISO 9001:2015 quality ISOISO 14001:2015 environment APIDesigned to API 610 ENEN 12266 valve testing IE4IEC 60034-30 motors ExATEX Zone 1 option NSFNSF/ANSI 61 drinking water 3.1EN 10204 3.1 material certs

FAQ

Questions plant engineers ask.

Not answered here? Our application engineers reply within one working day.

Ask an engineer
Can you replace a pump that is no longer made?

Yes. Send us the nameplate and the flange-to-flange length. We match the duty point and supply a pump on a matching baseplate, or an adaptor spool, so your pipework stays as it is.

How fast can I get a mechanical seal?

Seals for every Arus pump since 1992 are stocked in Klang and ship the same day for orders before 3 pm. For other makes, most cartridge seals arrive within five working days.

Are pumps tested before delivery?

Every pump gets a hydrostatic test at 1.5 × design pressure. Pumps above 30 kW also run on our performance test bench, and you are welcome to witness the test.

What does the free energy audit involve?

An engineer logs flow, pressure and power on your largest pumps for one week, then shows where they run against their curves and what an upgrade would save.

Which material should I choose for palm oil effluent?

Duplex 2205 for impellers and casings. POME is hot, acidic and carries sand, which wears cast iron out within one season. The selector above picks it automatically.

Do you supply to Sabah and Sarawak?

Yes, through stockists in Kota Kinabalu and Kuching, with field service from our Kuantan team on planned shutdowns.

Plant shutdown coming up? Book parts and service now.

Spares for every Arus pump since 1992, and field engineers across Peninsular Malaysia.

Request a quote Book a service visit